
Feasibility Assessment
The goal of Level 10 projects is to determine the technical and economic viability of a wood energy system at your site. The Wisewood team leads each step of the way:
Define project objectives
Collect data on your energy use and needs
Conduct energy modeling to determine the appropriate size for wood energy technology
Conduct a site visit to assess the site's logistics requirements and constraints
Develop preliminary operating and capital cost opinions
Summarize results in a written report
You'll walk away from Level 10 with a completed feasibility assessment and recommendations for customizing a biomass project to your needs.
CASE STUDY